Showing posts with label Forest. Show all posts
Showing posts with label Forest. Show all posts

Thursday, September 24, 2026

Disaster Recovery For Economic Revival

 

The devastating Bhotekoshi floods hit at a time when Nepal has just begun a journey of political stability after several decades of instability. The country was struggling to restore investor and business confidence, mobilise the abundant liquidity piled up in banks and financial institutions, and meet the development expectations of its people amid meagre resources. But the disaster dealt a massive blow to society and the economy, severing connectivity with China and sweeping away projects and infrastructure.

The floods not only killed hundreds and left thousands unaccounted for but also damaged residences, businesses, and infrastructure like hydroelectricity projects, roads, bridges, and social facilities. It affected more than 32,000 people in Rasuwa, Nuwakot, Dhading, and Nuwakot, and left thousands homeless. According to the Rapid Disaster Needs Assessment (RDNA) conducted by the National Planning Commission (NPC) and the National Disaster Risk Reduction and Management Authority (NDRRMA), the reconstruction and recovery cost is estimated at Rs. 723.3 billion, of which Rs. 473.6 billion is needed for the rehabilitation of the damaged infrastructure.

The disaster has inflicted extensive damage on the hydropower sector. It affected 13 hydropower projects with a combined capacity of 759 MW and five solar plants of 24 MW. Rs. 390.6 billion is estimated for the restoration of these projects and grid systems. Similarly, the floods damaged 69 km of strategic roads – Pasang Lhamu Highway connecting Rasuwagadhi at the Nepal-China border and the Prithvi Highway connecting Pokhara and Chitwan. The flood-induced damage at the fragile Krishna Bhir in Dhading obstructed the movement of people and essential goods to and from the Kathmandu Valley for about two weeks, creating a shortage of cooking gas and sending up the price of food items and vegetables.

Meanwhile, the government has received Rs. 14 billion in the Prime Minister Disaster Relief Fund, and the size is ever-growing with contributions from Nepali and foreign individuals and institutions. This is a relief to the government, as it can conduct the rescue, relief and short-term reconstruction work for the next six months with the money, as the RDNA has estimated that only Rs. 8.73 billion would be needed for these works.

 Poor capital spending

It seems that the trend of poor capital spending has continued this year as well. By the end of the second month of the current Fiscal Year 2026/27, the government could mobilise only 1.69 per cent (Rs. 7.26 billion) of the total capital allocation of Rs. 431.10 billion. Likewise, government income is surpassed by the total expenditures from the treasury. By mid-September, Rs. 184.24 billion has been collected in revenue, grants, and other receipts, while total expenditure reached Rs. 192.05 billion. This expenditure is largely comprised of recurrent expenses and repayment of the capital and interest of the loan.

If the government couldn't find an innovative way to speed up the public construction works and mobilise the development budget, it will further set back the national economy, hit hard by the disasters. Finance Minister Dr. Swarnim Wagle must find ways to pull the country out of the long-standing sluggish growth rate.

There is an opportunity. Concluding the Post-Disaster Needs Assessment (PDNA), managing funds and early action for post-disaster recovery and reconstruction can provide a much-needed boost to the economy. The foreign and finance ministers' activism is needed to rally the individuals, institutions, and friendly nations to provide financial support in the post-disaster reconstruction, which is almost double Nepal's annual capital allocation. For this, the two ministers should make multiple trips to various regions and countries, attend the United Nations General Assembly and the Conference of the Parties (COP).

Since it's impossible for Nepal to manage funds for the recovery and reconstruction, the government should immediately organise the donors' summit to raise funds for the post-disaster reconstruction. According to the government, experts are working on the PDNA report with an aim of completing it within three weeks. The donors' conference will be designed and executed after that.

Speeding up the infrastructure development works will not only support the physical development and increase public facilities but also help industries like cement, steel, crushers, transportation, and prefabrication.

 Boosting investors' confidence

The morale of the investors and entrepreneurs has not bounced back since the destruction of businesses and industries during the Gen-Z movement in 2025. They have either cancelled or halted their investment plans or business expansion. Meanwhile, there were instances like Bhatbhateni Supermarket that resurrected from the ashes, and several businesses, including hotels, are being reconstructed.

The country's financial system is burdened with excessive liquidity, which has increased the management costs of the banks and financial institutions and impacted investors' benefits. The Nepal Rastra Bank has to spend significant efforts and funds in managing this liquidity. Enhanced investors' confidence will help in mobilising this liquidity, which in turn creates jobs, injects money into the markets, and supports growth.

Enhancing access of small and medium enterprises (SMEs) to finance will help in mobilising these funds. But the government and the central bank should simplify the business as well as the financing process to support and promote the SMEs, which are the largest employment generators in the country. Likewise, finding international markets for 'made in Nepal' goods, promoting Nepali products there, and supporting the private sector in branding them is a must-do activity. Fully implementing the domestic goods procurement guidelines in the public offices within the country should also be a priority.

Meanwhile, the government has tried to implement capital market reforms to boost confidence in the securities market. Newly appointed chairman of the Securities Board of Nepal Dr. Gopal Prasad Bhatta and Finance Minister Dr. Wagle are working towards this end. Other areas that need to be promoted are tourism and information technology. The Bhote Koshi disaster has scared away potential tourists, with many of them cancelling trips to Nepal. The government and the private sector should run an international campaign to inform people that only a small portion of the country is affected by the disaster, and world-class touristic attractions like Sagarmatha and other mountain peaks, Chitwan, Pokhara, Bardiya, and several others are ready to welcome them.

Supporting farmers should also be the priority of the government. They should be provided with good irrigation, machinery, and fertilisers. High-quality labs should be established across the country to test the soil and water, as well as the quality of farmers' produce, and cold storage should be constructed to hold the produce until they get a good market price. Expanding all-weather roads to agricultural pocket areas in the hills and mountains will create better market access, and farmers will get a fair price for their produce.

Use of natural resources

Preserving the natural resources just for the sake of conservation will not benefit the communities and the economy. The nation must find a way to fully utilise the available resources, including the forest-based and river-based resources, to support businesses and industries and promote entrepreneurship. Opening up the forests for scientific management, allowing enterprises access to available resources, will help create entrepreneurs and businesses locally, thus creating jobs for the people and strengthening the local economy.

Currently, the country is preserving timber and non-timber products and importing wood for furniture and other products. Likewise, it is wasting an immense potential for exporting construction materials to India and Bangladesh. It is impossible for economic development to accelerate and become more widespread without taking advantage of these great natural resources.

Published in The Rising Nepal's Friday Supplement on 18 September 2026.    

Thursday, May 22, 2025

We must conserve forests: PM Oli

Kathmandu, May 10

Prime Minister KP Sharma Oli has said that the indiscriminate felling of Saal trees in the name of scientific forest management will be strictly stopped.

Inaugurating the Second National Forest Promotion Workshop organised by the Ministry of Forests and Environment on Saturday, he said that Nepal's Saal forests are an exceptional example of nature and that such tall trees are important for water retention, so they should not be commercially utilised before reaching maturity.

“Though the slogan ‘Green forest is Nepal’s wealth’ is an old one, forests had not been properly utilised as a resource. However, we have now made a firm commitment to prevent the destruction of forests and to contribute to the solar system’s balance by conserving and properly utilising the forests,” said Prime Minister Oli.

According to him, Nepal has increased efforts in forest conservation. Now, instead of merely expanding forest areas, it needs to move towards productivity. “For the commercial utilisation of forests, we must adopt a policy that avoids both haste and delay,” he said.

Currently, forests make up 46 per cent of Nepal’s land area.

Noting that Nepal is a country rich in nature and vitality, PM Oli highlighted that this also contributes to global environmental efforts. He emphasised the need to strengthen forests and convert bushlands into dense forests.

He further said that agriculture and forestry officials could collaborate to promote fruit cultivation and that olive farming could be expanded in the Himalayan region. He urged against regionalism, encouraging cooperation among all regions.

Stressing that encouraging farmers towards livestock farming would support renewable forestry, PM Oli added that expanding pastureland would help integrate forest and agricultural ecosystems.

“I was criticised as being anti-environment when I said we don’t need to further increase the number of tigers. But people misunderstood. A tiger doesn’t read law books when it gets hungry and can’t find food; it attacks people. Just because a tiger in a photo looks harmless doesn’t mean it won’t cause harm,” said Prime Minister Oli.

Nepal has more than doubled its tiger population in line with international commitments. Those living near forests understand the difficulties involved. “Environmental conservation is meant for the welfare of humanity. If humanity itself is unsafe, environmental protection becomes meaningless,” he said.

He also pointed out that some countries still refuse to honour the Paris Agreement and stressed the need for global cooperation in this regard. 

Published in The Rising Nepal daily on 11 May 2025. 

Saturday, August 13, 2022

Irregularity won't be tolerated in land compensation distribution: Minister Yadav

Kathmandu, Aug. 6

Forest and Environment Minister Pradeep Yadav has said that not even a single tree will be cut until the land that has already been compensated is cleared and adequate budget is ensured.

"Only if the necessary budget for the construction of the airport in Nijgadh is ensured by evacuating Tangiya village, which has received compensation for the construction of international airport, the Ministry of Forests and Environment will give permission to cut the trees," he said while inaugurating building of Armed Forest Guards Barracks at Sagarnath in Ishwarpur Municipality-4 in Sarlahi.

According to the Secretariat of Minister Yadav, he made it clear that he was not against Nijgadh Airport as it would be the lifeline of Madhes.

But he stated that he was against the practice of clearing the land by cutting the trees, and then establishing a settlement there and distributing the compensation given.

"This doesn't work anymore. The ministry will not allow the cutting of even a single tree until the necessary budget for the airport is ensured by clearing the land that was previously compensated," the secretariat quoted the minister as saying.

Stating that he would not back down from taking any steps to bring down the forest mafia, he instructed the forest guards to work for the protection of forests as per the instructions of the ministry.

The Minister said that as the Ministry of Forests is an agency that is not applauded but criticised, he urged them to show due diligence in forest protection even after being scolded. Stating that complaints have been heard about giving chances to the smugglers for wood, stone and pebble smuggling, he asked them to improve and follow the instructions of the ministry.

Minister Yadav said that as the MoFE would organise a programme to honour the best employees and necessary preparations were being made, the guards should put their efforts to receive the honour from the country.

Rich people have also occupied the land in the name of landless so the land-ownership certificates will be distributed only after proper verification of such people, he said.

"There are also people who own luxurious houses and cars in Kathmandu and other big cities, and also have received the landless identity. I know hundreds of them. We will not spare those who don gold chains worth hundreds of thousands and pretend to be landless," said Minister Yadav. 

Published in The Rising Nepal daily on 7 August 2022. 

Friday, September 25, 2020

PAC sub-committee suggests punishing forest officials for abuse of authority

Kathmandu, Sept. 24

A subcommittee formed under the Public Accounts Committee (PAC) of the Federal Parliament has suggested taking stern action against at least six senior forest officials from the states and districts for abusing authority and misusing forest resources.

It has requested the PAC to direct the government to conduct further investigation into the issue and punish the responsible authorities who supported in preparing fake decisions and documents that contributed to deforestation and ecological accidents.

The subcommittee formed to study the 'Scientific Forest Management Programme' and led by Pradip Yadav and represented by Prem Bahadur Ale and Mina Subba has submitted the report to the house panel last month.

According to the report, State Forest Director of the Sudurpaschim Hemraj Bista, and Divisional Forest Officers (DFOs) in Pahalmanpur Krishna Dutta Bhatta, DFOs in Dhangadhi Ram Chandra Kandel, in Kanchanpur Ajaya Bikram Manandhar, in Taulihawa Ishwari Prasad Poudel, in Nawalpur Bijaya Raj Subedi, in Kamalamai Narayan Shrestha, and in Marin Pushpa Raj Bartaula were found directly misappropriating the forest resources.

Many of these officials have colluded with the sawmills and woods traders in felling down the trees during the forest monitoring and authenticated the illegal cutting of the trees.

"They have knowingly approved the fake documents prepared by the community forests, users' groups general meetings, members of the forest users' group and forest officials. This is an activity against the Environment Protection Act, 2010 and Forest Act, 2019. This is the embezzlement of the national resources," read the report.

According to the report, Bhatta of Divisional Forest Office, Pahalmanpur and Kandel of DFO Dhangadhi of Kailali were living a high-standard life beyond their actual capacity with the illegal money they earned in collusion with the sawmills and wood traders. Kandel had issued orders to chop down the trees ignoring the continuous requests from the forest users' group to halt the act.

Likewise, Subedi of DFO in Nawalpur district had abused his authority by creating unusually wide forest road and fireline in the forest areas. Subedi, Shrestha of Kamalamai of Sindhuli and Bartaula of Marin of Sindhuli also ordered to cut the trees in the ecologically vulnerable Chure region.

The subcommittee has also found that the Ministry of Forest and Environment, states' Ministry of Industry, Tourism, Forest and Environment, provincial forest directorate, forest offices and forest users groups were not submitting the appropriate documents rather than they were hiding or damaging them, providing fake and fabricated data. Many districts never submitted the asked documents and data to the sub-committee.

"The PAC should direct the MoFE to create a reliable and integrated information management system to address such maladies," recommended the subcommittee.

Instead of providing the technical support to the community and collaborative forests as per the laws and bylaws, the forest offices have been found unusually providing hundreds of thousands of rupees to the consultants while the consultants prepared the reports without making a single trip to the field. Most of the work procedures and action plans prepared by such consultants were fake and misfit.

Published in The Rising Nepal daily on 25 September 2020.

Sunday, February 4, 2018

NA expedites construction work at Ktm-Terai Expressway



Nijgadh, Feb. 3:
The Nepal Army has cleared the forest at the Nijgadh subsection of the 76-kilometre Kathmandu-Terai Expressway and begun landfilling and compressing the road.

Currently, the NA is working on a 3-kilometre section at Nijgadh of Bara district in south central Nepal, starting from the Mahendra Highway, where road filling and levelling works are underway.
An 8-km stretch of the road project has already been cleared, and preliminary works are being carried out. 

“We have expedited the construction works here because the road filling work has to be finished before the monsoon, otherwise the road will be filled with water, and we might have to wait for about four months,” said Bharat Lal Shrestha, Lieutenant Colonel of the NA and the project’s Sector 2 Commander. 

The project aims to complete the earth filling works by June end.
The height of the road will be about 2 metres from the land level, and road filling and compression is done at every 15-inch thickness. 

The engineers had tested the compression level on the first 50 metres of the road on Friday and found it to be of the required standard. 

Chief of the project’s Camp at Nijgadh, Ramesh Marasini, said that the filling materials were being brought from Mauri Bheer (cliff), situated at the foothills about 8 km away.

“The materials of Mauri Bheer were tested and approved for use on the expressway. We fill the road about 15 inches and compress it, and the process is repeated until the desired height is achieved,” he said. 

The NA has expedited the construction of the national pride project, also known as the Fast Track Road, since January this year by clearing the trees on the road’s right of way starting from the Mahendra Highway at Nijgadh towards the north. 

However, the Army has not chopped down all the trees on the road right of way (RoW). It has cleared only about 30 metres in width while the expressway is 100 metres RoW in the Terai. 

The project wanted to keep the trees as far as possible. They are to be cut as per the necessity in the future. 

Brigadier General Bharat Bahadur Khadka is leading a troop of more than 150 army personnel to cut down the trees and clear the forest areas. 

Even though there are 5,500 trees on the RoW of the expressway, only 3,900 trees have been cut in the Nijgadh area, said Khadka, who is now working at Budune of Makwanpur district.
“About 15 km in area remains to be cleared. As we have a large team from the army and needed cooperation from the concerned government agencies, such as the Department of Forests, the work will conclude soon,” he said. 

As many as 15,000 trees need to be chopped down for the project.
The NA had opened an 80-km-long track of the multi-billion-rupee project five years ago.
Erstwhile Prime Minister Pushpa Kamal Dahal Prachanda had laid the foundation stone for the expressway - the shortest route connecting the capital city with the Terai - in May last year.
The government had, through a Cabinet decision, handed over the road project to the NA in August 2017, and the latter aims at completing the national pride project in four years. 

After more than five years of dilly-dallying about how to build the road and the financial modality to be adopted, the KP Sharma Oli administration had announced that the expressway would be built by Nepal itself.

Published in The Rising Nepal daily on 4 February 2018.

Featured Story

Govt prepares primary draft of DRR Policy

Kathmandu, Apr. 29: The government has prepared the preliminary report of the National Disaster Risk Reduction (DRR) Policy and Strategic ...